The Sheds have a connector bridge that joins the 2nd floors of the two buildings. These photos show the steel being erected for this connector.
Wednesday, April 23, 2014
Thursday, April 10, 2014
Concrete permieter foundations
The weather is finally cooperating enough to pour concrete. Building C perimeter is poured in preparation to start wall framing.
Site Infrastructure
We are installing all of the storm water, sewer and water infrastructure now. These are deep connections!
Spring finally arrived
I have a back log of post to catch up on this project. Fortunately, the weather is much better and we can start making good progress on construction. The last post showed the steel that is being installed for the new second floor, here is a time lapse video capturing the process.
Monday, January 20, 2014
Adding a 2nd Floor
The steel that is creating the new second floor in Shed, building A, began to be installed. The first new foundations are going in as well. Not the most immediately gratifying, but it is good progress and preparing the way for the new exterior skin.
A view from the courtyard:
A view from the courtyard:
Tuesday, December 17, 2013
Uncovering and Courtyards
Most of the old metal skin is off of the structure and the definition of the structure that will remain is taking shape. These pictures show rows of exposed trusses that will remain in the area that will become courtyards.
Tuesday, December 3, 2013
Stone Production