Monday, April 28, 2014

Announcing First Tenant

Welcome to The Sheds, Invivolink.  We are excited to have you all.

http://www.tennessean.com/story/money/real-estate/2014/04/28/invivolink-headed-sheds-charlotte/8409509/


Wednesday, April 23, 2014

Connector Bridge

The Sheds have a connector bridge that joins the 2nd floors of the two buildings.  These photos show the steel being erected for this connector.

Thursday, April 10, 2014

Concrete permieter foundations

The weather is finally cooperating enough to pour concrete.  Building C perimeter is poured in preparation to start wall framing.

Site Infrastructure

We are installing all of the storm water, sewer and water infrastructure now.  These are deep connections!

Spring finally arrived

I have a back log of post to catch up on this project.  Fortunately, the weather is much better and we can start making good progress on construction.  The last post showed the steel that is being installed for the new second floor, here is a time lapse video capturing the process.